Additional information
Weight | 0.7 lbs |
---|---|
Dimensions | 8 × 4 × 3 in |
Waterproof | Yes |
Starting At: $17.38 USD
Our transconnect cables are perfect for running power from your transformer to your lighting. Available in lengths from 20 ft – 60 ft so no matter your lighting setup, we have a connector cable to fit your needs.
Weight | 0.7 lbs |
---|---|
Dimensions | 8 × 4 × 3 in |
Waterproof | Yes |
Only logged in customers who have purchased this product may leave a review.
Click here for most current information: WARRANTY POLICY.
2655 S. Santa Fe Unit 4-A
Denver, CO 80223 USA
DEKOR®️ Canada Fulfillment
205 Champagne Drive, Unit 3A
Toronto, ON, M3J 2C6, Canada
Toll Free: 1-800-258-0344
Copyright 2024| Privacy Policy | Accessibility Statement | WordPress Web Design & Hosting Santa Barbara
Yes, DEKOR® manufactures all circuitry in Denver, CO providing excellent quality.
DEKOR® offers a COLORKONNECT WiFi controller and through the app you can dim the lights, change colors, and set schedules. You may also control light colors with dimming capability manually on the front face of the COLORKONNECT WiFi device.
When using the COLORKONNECT WiFi controller app provides you the ability to control your lights regardless of where you are located.
The 3W4PORT splitter/repeater has two functionalities: the splitter is used to connect the power wire and the three additional ports for 2-3 lights based on your lighting plan. The repeater is to be used every 20’ with long cable runs and at the light connections to enhance the signal creating pure colors from the first light to the last.
DEKOR® offers a simple 3W4PORT Plug-N-Play system with various cable lengths to make the install easy in any application.
Yes, with the use of two or more COLORKONNECT WiFi controllers and wiring two or more zones will deliver different light color patterns.
Yes, you can add to your current non-RGBW DEKOR® lighting system by adding RGBW lights! While the non-RGBW DEKOR lighting system is a 2-wire direct current system, and the RGBW DEKOR lighting system is a 3-wire direct current system, you are able to integrate both systems by creating a separate zone. Either using a splitter running from you current transformer or upgrading to a 100 or 200 watt transformer, which has more than one output from the transformer, you can create an additional zone or zones. Please call us if you need us to walk you through this!
The transconnect cable is for our standard DEKOR® Lighting 2-wire lights. The COLORCONNECT WiFi controller is a 3-wire system. The male-to-male cables come in lengths of 20”, 5’, 10’, 20’ are to be used to connect the COLORCONNECT WiFi controller and then to your first light.
For our RGBW system: The 36-watt and the 60-watt transformers will include one (1) 20’ 3WPNP male-to-male cable. The 100-watt transformer will come with (1) transconnect cable and (1) 20’ 3WPNP male-to-male cable. The 200-watt transformer will include (1) 20’ transconnect cable with two lead wires and (1) 20’ 3WPNP male-to-male cable.
The 3W4PORT splitter/repeater may only be used with the RGBW system. The 6-port splitter is a two wire and can only be used with our standard DEKOR® Lighting system.
Bret S. (verified owner) –
Forrest (verified owner) –
Good product but shipping very expensive
Al F. (verified owner) –
Eric Sanders (verified owner) –
Great product
Garnet M. (verified owner) –
All pieces integrated easily together and with next generation LED’s provide a nice lighting package.
Kyle DePasquale (verified owner) –
Michael D. (verified owner) –
Christopher J. (verified owner) –
Jason J. (verified owner) –
Riley Keaton (verified owner) –
Anonymous (verified owner) –
Jesse W. (verified owner) –
Worked great for our application…easy plug and play!
Linda D. (verified owner) –
Darrell Kinchelow (verified owner) –
So far so good
JOHN ANGIULO (verified owner) –
Douglas (verified owner) –
Great system – used to repair damage done by pavers
john h. (verified owner) –
Mike A. (verified owner) –
Plug and play wiring is great.
Cletus Breeding (verified owner) –
Parisa Alavi (verified owner) –
Frederick Schutte (verified owner) –
Steven Chizzoniti (verified owner) –
thomas sheen (verified owner) –
Joseph B. (verified owner) –
works
Lori (verified owner) –
Great product. Would be nice if they came in shorter length options.