Existing Stock Transformer to Connector Long Leads @ Blowout Pricing (While Supplies Last)
Existing Stock Transformer to Connector Long Leads @ Blowout Pricing (While Supplies Last)
Save 50%
Regular price
$17.38 USD
Sale price
$17.38 USD
Regular price
$34.76 USD
Shipping calculated at checkout.
Easy Installation Instructions
Easy Installation Instructions
Helpful Resources
Product Documents
- Certifications ETL Listed
- Connector cable ends Transconnect to male
- Housing material ABS
- Manufacturer DEKOR® Lighting
- Product spec sheet
- Voltage 12VDC
- Waterproof Yes
- Weight 1 lb
- Waterproof connections
- Plug-N-Play, no cutting, splicing or crimping
- 22 AWG wire
- Made for DEKOR transformers
- Suitable for indoor or outdoor use