- Waterproof connections
- Plug-N-Play, no cutting, splicing or crimping
- 22 AWG wire
- Made for DEKOR transformers
- Suitable for indoor or outdoor use
QUESTIONS? Call Us! 1-800-258-0344
Skip to contentStarting At: $17.38 USD
Our transconnect cables are perfect for running power from your transformer to your lighting. Available in lengths from 20 ft – 60 ft so no matter your lighting setup, we have a connector cable to fit your needs.
Waterproof | Yes |
---|
Only logged in customers who have purchased this product may leave a review.
Lori (verified owner) –
Great product. Would be nice if they came in shorter length options.
Joseph B. (verified owner) –
works
thomas sheen (verified owner) –
Steven Chizzoniti (verified owner) –
Frederick Schutte (verified owner) –
Parisa Alavi (verified owner) –
Cletus Breeding (verified owner) –
Mike A. (verified owner) –
Plug and play wiring is great.
john h. (verified owner) –
Douglas (verified owner) –
Great system – used to repair damage done by pavers
JOHN ANGIULO (verified owner) –
Darrell Kinchelow (verified owner) –
So far so good
Linda D. (verified owner) –
Jesse W. (verified owner) –
Worked great for our application…easy plug and play!
Anonymous (verified owner) –
Riley Keaton (verified owner) –
Jason J. (verified owner) –
Christopher J. (verified owner) –
Michael D. (verified owner) –
Kyle DePasquale (verified owner) –