SKU: EZPNPxxTRANSCONN

Existing Stock Transformer to Connector Long Leads @ Blowout Pricing (While Supplies Last)

Starting At: $34.76 USD

Save now with blowout pricing on these existing single wire cables while supplies last. Blowout cables are non-returnable/final sale.

Our transconnect cables are perfect for running power from your transformer to your lighting. Available in lengths from 20 ft – 60 ft so no matter your lighting setup, we have a connector cable to fit your needs.

DEKOR® Lighting is transitioning to new and improved wiring, replacing clear (single wire) with black heavy duty (2-wire). We carefully designed this new system to be backwards compatible with our current clear wire cables.

Want to buy the new cables? Click Here



Additional Information

Additional information

Weight .7 lbs
Dimensions 8 × 4 × 3 in
Waterproof

Yes

Warranty

Click here for most current information: WARRANTY POLICY.

Manufactured in the USA

Family-Owned & Operated for More Than Two Decades

When you choose DEKOR® lighting solutions, your order is built and assembled by true craftsmen. Our make-to-order approach means that we manufacture most of the products in your order, making sure they meet higher quality standards and a higher standard of craftsmanship than mass-produced products.

Your Partner in Custom Design and Build Solutions

20+ Years of Manufacturing Innovation

20+ Years of Manufacturing Innovation

Plus
Quick Installation EZ Plug-N-Play

Quick Installation EZ Plug-N-Play

Plus
Professional Grade, Premium Quality

Professional Grade, Premium Quality

Manufactured in the USA